Underfloor Heating Installation – Westmeath 2016
- 17mm PE-RT pipe tacked to 150mm floor insulation
- Heating pipe laid at 100mm centres for optimum heat pump efficiency
- Doorway Expansion Joint Protection
- UFH Manifolds in GF Utility and FF Walk in Wardrobe
- System filled with 300L rain water to eliminate lime/contaminants
- Customer then poured 60-70mm concrete screed floor over the UFH system
- Geothermal Heat pump was then switched to a 14 day Concrete Dry Out setting